Is a company quoting you for mold work, and is the price near $7,500? That number is where Louisiana's license rule starts, and it changes what you can expect on paper. This guide shows you what to ask whether your job sits above the line or below it.

Embossed wallpaper peeled back from a wall, with dark growth on the back of the paper and on the wall behind it

What the line is

Louisiana sets who counts as a mold remediation contractor by what the job costs. Under R.S. 37:2150.1, it is a person who removes or treats mold where the project value is $7,500 or more. The licensing board's page puts it as more than $7,500. The statute's wording, $7,500 or more, is the one to go by, so treat a quote of exactly $7,500 as on the regulated side.

So the line is not about the size of the stain. It is about the total cost. Ask for the whole price in writing before you decide which side you are on.

If your job is over the line

At $7,500 or more, the contractor needs a Louisiana mold remediation license. You are entitled to a written report at the end of the job. On that $7,500 job, the statute also bars the mold remediation contractor from both assessing and removing at your address.

Ask for the number and run it through the board's public search. Ask who wrote the findings. If the same company wrote them and priced the removal, ask for a separate assessor.

If your job is under the line

Under $7,500, the license rule does not apply, and the statute's separation bar and report duty do not reach the contractor.

That does not mean you should give up the protections. We keep your assessment and removal with separate companies at any price. Ask the removal company for its scope in writing, ask whether it holds a license anyway, and ask for a written account of what it did. Keep that page with your photos and your contract. Send us the scope and the price, and we help you see which side you are on.

When a job is cut in two

The statute anticipates one common move. Under R.S. 37:2158(B)(1), dividing a contract or scope of work so it falls under the license threshold is disregarded, and the parts are treated as one job.

You do not have to assume anyone means harm. Sometimes a scope really does come in two parts. But if you are offered two small invoices for one wall, ask the company to put the whole scope on one page, and compare it with a second quote.

How to know which side you are on

  1. Ask for the findings in writing before you ask for a price.
  2. Ask each removal company to price the same written scope.
  3. Ask whether the price covers materials and rebuilding as well as labor, so you compare one total.
  4. Ask whether rebuilding the wall is inside the price or on top.
  5. Keep every quote, dated, in one folder.

If two quotes land on either side of the line, ask why. The difference may be real, a different scope, or a difference in how the job was cut.

Drops of water beaded on a textured grey wall

Permits and who issues them

Some mold and water jobs need a building permit, and some do not. The City of New Orleans says interior painting and papering is exempt. If you are unsure, ask the company which office it will call.

If you live in Metairie, Harvey, Marrero, Chalmette or another unincorporated community, the parish handles permits, not a city hall. Ask the removal company which office it will call, and ask for the permit number before work starts if one is needed.

Basis: Contractors Licensing Law, Title 37 of the Louisiana Revised Statutes; La. R.S. 37:2150.1, Definitions

Tell us where it shows

We help you learn whether the water is a leak or your own air, then line up an assessor first and a separate company to remove or dry it.

TermsPrivacy Policy

Before anyone pulls the paper

  1. Photograph the stain, wide and close

  2. Note when it first showed and what changed

  3. Write down what covers the wall

  4. Watch whether it grows after water runs

  5. Ask for the removal company's license number

  6. Keep the assessor away from the removal job

  7. Have the scope on paper before work begins

Four things to tell the contractor

  1. 1. Where it shows

    Which room and wall is it on, and how high up?

  2. 2. When it started

    When did you first see or smell it?

  3. 3. What covers the wall

    Is the wall vinyl paper, gloss paint, tile or paneling?

  4. 4. Anything dripping

    Does a pipe, roof, window or AC line drip near it?

$100 OFF

$100 off your first job

Claim the creditOffer terms

  • The $100 comes off once your first job in the parishes is booked.

  • We pay the $100 out of our fee; the contractor's price does not change.

  • One credit for each customer at each property they own or rent.

  • Book that first job on or before December 31, 2026, to use it.

  • Say you have the credit when you book, and we confirm it.

The Room Side promise

  1. You can ask us anything without paying or signing.
  2. The source of the water gets settled first.
  3. Your assessment and your removal stay with separate companies, at any price.
  4. Your $100 credit is applied the way our Terms say.

The work itself is between you and the company you hire.